Air Preheat
John Zink Company maintains air preheaters and blowers on site to simulate the preheated combustion air required for actual furnace operation.
Two custom-designed air preheaters are computer controlled
for accurate, remote air flow and temperature adjustment. In forced-draft
tests, Zink can meet the air flow required for a burner firing
up to 25 MMBtu/hr, at air preheat levels up to 1,000°F. Equipped with
wheels, these one-of-a-kind air preheaters are mobile for quick relocation
to and use at any of our 14 furnaces.
Whatever your application, we have the equipment, including additional air preheaters and blowers, to test your burner in an environment that simulates real-world operation.
Contact a Zink® representative for additional information.
John Zink Company, LLC
11920 East Apache
Tulsa, OK 74116
United States of America
+1-918-234-1800
email: info@johnzink.com
|