John Zink Company LLC Flares Parts and Service
 Site Map Careers e-Library What's New Contact Us
Partial
johnzink.com
Parts & Services
Flare Parts & Services
- Turnaround Planning
   - Turnaround Checklist
      - Ignition Systems
      - Pilots
      - Flares
      - Vessels
      - Stack Inspection
      - Flare Accessories
   - Combustion Surveys
   - Turnkey Services
- Emergency Shutdown
- Upgrades and Retrofits
- Maintenance & Troubleshooting
- Literature
- Flare School
- Flare P&S Inquiry
- Flares
Burner P&S
Thermal Oxidation P&S
Vapor Control P&S

 

 

Inside John Zink:
About John Zink
Environmental, Health and Safety
COOL Technologies
Inquiries
Markets We Serve
John Zink Products:
- Burners
- Flares
- Flare Gas Recovery
- Vapor Control
- Thermal Oxidation
Parts & Service
Rentals
Sales Offices
Technology/R&D
John Zink Institute
Virtual Tour
Ignition Systems Pilots Flares Vessels Stack Inspection Flare Accessories
Utility Steam Steamizer Air Assisted Enclosed Ground

Molecular Seal


Molecular Seal

Shutdown Items

1.0 Remove any foreign material that has accumulated in the bottom of the Molecular Seal.
2.0 Use ultrasonic examination or other suitable method to check material thickness on bottom of unit. This is especially important in corrosive gas service or if any obstruction of the drain line has allowed water to remain in the unit for an extended period of time.

Periodic On-line Items

1.0 Flush loop-seal piping to remove any foreign material that has washed down from the Molecular Seal.
2.0 Ensure that the siphon break-vent line is open and clear of obstructions.

Contact a Zink® representative for more turnaround details.

Western Hemisphere Europe Asia-Pacific
1-800-755-4252
(in U.S. & Canada)
+1-918-234-2751
(International)
+352-51899-332 +65-6732-7555

John Zink Company, LLC
11920 East Apache
Tulsa, OK 74116
United States of America
+1-918-234-1800

email: info@johnzink.com